Modern field guide · Updated September 10, 2026

Video Wall Planning Checklist for Builders and Developers

Plan an LED video wall before construction: a practical checklist for Arizona builders and developers covering drawings, trades, infrastructure and handoff.

The short answer

Bring the video wall into design coordination before the wall, power and finishes are finalized. Agree on the intended use and cabinet configuration, assign each trade's responsibilities, and reserve installation and service access. Use the selected equipment's drawings to complete the plan.

1. Establish the brief

Give the display a clear purpose so the team can make consistent decisions throughout the project.

  • Identify the room, viewing positions and nearest viewer.
  • List the content: films, sports, digital art, presentations or scheduled signage.
  • Identify the decision-maker and the person responsible for daily operation.
  • Share project location, construction stage and target completion date.

2. Coordinate drawings and infrastructure

Use the actual equipment configuration for coordination. Manufacturer planning documents distinguish display layout, power, signal routing and architectural review.

  • Confirm assembled dimensions, mounting depth and required clearances.
  • Have the responsible designer verify structural support and attachment details.
  • Coordinate electrical loads, circuit requirements and connection locations with the electrician.
  • Review heat output, ventilation, equipment location and cable pathways.
  • Keep finishes and trim clear of installation and service access.

3. Assign the scope before ordering

Make the proposal useful to every trade. Record who supplies, installs and signs off each part of the project.

3. Assign the scope before ordering
ScopeConfirm with the project team
Display and processingApproved configuration, sources and operating requirements.
Construction and finishesWall preparation, mounting coordination and finish restoration.
Electrical and networkResponsible trades, drawings, readiness checks and equipment locations.
Room integrationAudio, lighting, shades and control programming included in the proposal.
Handoff and supportAcceptance process, documentation, training and service contact.

4. Schedule a readiness review

Arrange a coordination check before delivery. Review the drawing revision, outstanding trade work, delivery route and installation sequence. In an occupied commercial property, agree on working hours, access and how the installation area will be managed. Record decisions and any scope changes before the installation date.

5. Define what a completed project looks like

Agree on a handoff that the homeowner or operator can use.

  • Demonstrate the agreed sources and everyday controls.
  • Review the image using the intended content and viewing positions.
  • Provide equipment information and the agreed system documentation.
  • Explain support contacts, warranty terms and how service is arranged.
  • Record remaining items with a responsible person and next step.

Start with a plan review

Modern Smart Home is a Viral Video Walls Premier Partner serving luxury residential and commercial projects across the Phoenix metro. Share available plans or room photos with our team to discuss the display and its place in the wider technology scope. We work directly with builders and developers to coordinate the next decisions.

Practical guidance

Related questions.

When should we involve Modern Smart Home?+

Ideally during design development, while the wall, infrastructure and finish details can still be coordinated. For an existing property, involve us before committing to a recess, millwork or display configuration.

Does this checklist specify the electrical or structural design?+

No. It identifies the decisions to coordinate. Final requirements come from the selected equipment and mounting documentation, with the responsible project professionals completing the design.

Can planning start before every dimension is final?+

Yes. Share the available drawings and intended use. We can identify outstanding decisions and planning assumptions; final configuration and installation scope follow the coordinated design.

Begin with the vision

Tell us what you are building—and how exceptional you want it to feel.

Plan a consultation